Pre-Upgrade Procedures
Before upgrading Aras 3D Visualization:
-
Users should be informed that Aras Innovator will be down.
-
The Aras Innovator code tree, Conversion Server, HOOPS Converter, and database should be backed up. Such files should be placed in a safe location as they will be used for reverting to the pre-upgrade condition if the upgrade fails.