Pre-Upgrade Procedures

Before upgrading Aras 3D Visualization:

  • Users should be informed that Aras Innovator will be down.

  • The Aras Innovator code tree, Conversion Server, HOOPS Converter, and database should be backed up. Such files should be placed in a safe location as they will be used for reverting to the pre-upgrade condition if the upgrade fails.